The sludge in the primary chamber became too thick and burnt out the stirrer motor, resulting in the system not functioning correctly.
Download PDF
A sewerage blockage occurred, that overflowed from a manhole, into the Cinderella dam over a period of time.
Download PDF
The anaerobic primary ponds became totally congested with anaerobic sludge due to a hydraulically overload situation.
Download PDF
Final effluent discharges into Caledon River with an E.Coli count of over 22 000 / 100mls
Download PDF
The final effluent of the piggery was not conforming to discharge standards and DWAF was concerned.