The pump station well was congested with solid sewerage and the pump burnt out.

Download PDF

The sludge in the primary chamber became too thick and burnt out the stirrer motor, resulting in the system not functioning correctly.

Download PDF

A sewerage blockage occurred, that overflowed from a manhole, into the Cinderella dam over a period of time.

Download PDF

Congested Maturation/Holding Pond with years of buildup of stabilized sludge

Download PDF

The anaerobic primary ponds became totally congested with anaerobic sludge due to a hydraulically overload situation.

Download PDF

Final effluent discharges into Caledon River with an E.Coli count of over 22 000 / 100mls

Download PDF

Timeline of Pit Toilet Dosing

Download PDF

Totally congested aeration chamber cleared after just 4 weeks of dosing

Download PDF

The final effluent of the piggery was not conforming to discharge standards and DWAF was concerned.

Download PDF

Primary oxidation pond infested with an aquatic weed.

Download PDF